Back to Newsfeed

Moray Street upgrade completed

We have completed the bicycle path upgrades on Moray Street. The new bike path and roundabouts provide a safe and reliable alternative north-south route for cyclists during Metro Tunnel works on St Kilda Road.

This hybrid solution splits the design of the Moray Street bike path into 2 sections.

From Conventry Street to City Road, a 2m wide protected bike lane has been created along sections of Moray Street, running alongside the footpath, at road level. The bike lane is separated from traffic with a 1m mountable kerb, keeping cyclists away from parked cars and moving traffic.

From Albert Road to Coventry Street, a dedicated bike lane continues to run between the on-street parking and the traffic lane. Line marking has been removed and enhanced to improve the existing bike path.

The 2 roundabouts at Dorcas Street and Coventry have been upgraded to a new and innovative protected design which gives pedestrians and cyclists right of way to allow for safe crossing.

Metro Tunnel