Back to Newsfeed

Soaring toward career and construction goals at Anzac Station

Excavation of the station box for the Metro Tunnel’s new Anzac Station is now underway, marking the start of large-scale excavation across all 5 station sites.

As part of the ongoing works, there will be traffic disruptions on St Kilda Road between Dorcas Street and Kings Way/Toorak Road West on from 11.30pm to 5.00am, to relocate large construction equipment.

Engineering cadets and other tertiary students have been essential in the plan’s move forward, having worked a combined 135,000 on the Metro Tunnel project.

Metro Tunnel