Back to Newsfeed

Swapping Seats at Federation Square

Together with the Bicycle Network we’re taking our Swapping Seats safety initiative to the banks of the Yarra next to Federation Square on Thursday 6 June 2019, between 7.30am and 6pm.

People who ride, walk and drive will be able to swap seats with a truck driver to gain a better understanding of what can and can’t be seen within the cabin of a heavy vehicle.

Metro Tunnel