The level crossings at Evans Road and South Gippsland Highway will be removed with a road bridge design.

Fast facts

Evans Road, Lyndhurst

  • When Evans Road is reopened, locals will save about 12 minutes for a round trip between Thompsons Road and South Gippsland Highway.
  • Works will be fast tracked with construction to begin this year.
  • The crossing will be gone by 2020.

South Gippsland Highway, Dandenong South

  • 31,000 vehicles travel across the level crossing each day.
  • The design will provide significant benefits to the community, including improving pedestrian connections and access to important services.
  • The level crossing will be removed by 2022.
/
Artists impression of South Gippsland highway.
Artist impression of South Gippsland Highway.
Artist's impression of an aerial view of the road bridge design at Evans Road in Lyndhurst
Artist's impression of a pedestrian's view of the road bridge design at Evans Road in Lyndhurst