There will be changed traffic conditions on McGregor Road from 4 March until mid-2024.
The northbound lanes on McGregor Road will be closed between the Princes Freeway and Livingstone Boulevard, as we build a new northbound lane. During this time:
- one lane of traffic will run in each direction on the southbound lanes of McGregor Road
- there will be no right turns from McGregor Road to Henry Road or Webster Way
vehicles over 8.8m long will not be able to turn left from Henry Road or Webster Way into McGregor Road.
View a downloadable version of the McGregor Road detour map (PDF, 99.3 KB)
Vehicles travelling towards the Princes Freeway on McGregor Road can access Henry Road by detouring further south and performing a U-turn at the freeway roundabout. Vehicles away from the Princes Freeway on McGregor Road can access Webster Way by detouring via Park Boulevard and Honeyeater Way.
A section of footpath on Henry Road will also be closed. A pedestrian detour will be in place via Heritage Boulevard and Livingstone Boulevard.
View a downloadable version of the McGregor Road pedestrian detour map (PDF, 96.8 KB)