Fact sheet

Caulfield to Dandenong new electrical substation

1 September 2017

The Level Crossing Removal Project: Caulfield to Dandenong is removing 9 level crossings and rebuilding 5 stations on the Cranbourne Pakenham train line. The project will reduce congestion on the local road and rail network, and deliver a safer and more reliable train service, contributing to a 42% increase in capacity.

To be able to make these improvements and prepare the lines for new High Capacity Metro Trains (HCMTs) in 2019, we need to install 12 new electrical substations and upgrade 9 existing substations along the Cranbourne Pakenham line.

A substation provides the necessary power to operate trains, signals and communication equipment.

As part of the Caulfield to Dandenong Project, the Level Crossing Removal Project will be constructing 12 new substations and upgrading 9 existing on behalf of Public Transport Victoria.

Substations are an integral part of Melbourne's train network. They convert and supply household electricity to operate trains, signals and communication equipment.

In order to make improvements to the capacity of the network, such as the introduction of HCMTs in 2019, we need to build new substations. By undertaking these upgrades, more trains will be able to run along the Cranbourne Pakenham lines, ensuring the network can cater for future growth.

The locations of substations have been determined by the power requirements of the new train and the proposed service plans, and to ensure the train receives a minimum voltage to be able to operate.

Where possible we are upgrading existing substations, and new substations have been placed to strengthen the network where there are no existing substations.

Installation of the first substation started during July 2017 in Dandenong. Installation of the remaining substations will continue through 2017 and 2018. Each substation is expected to take 2 or 3 months to complete, dependent on the location, weather and ground conditions.

New substations in residential areas will have screening and landscaping treatments.

The project team will also work to identify screening and planting opportunities for new substations in non-residential areas.

The 12 new substations are prefabricated buildings with the following standard dimensions:

  • Length: 35m
  • Width: 5.2m
  • Height: 4.7m*

*This includes the substation foundations which are approximately 1.2m high.

The 9 substations that are being upgraded vary in size. At these substations, only the electrical equipment inside and outside the substation building will be upgraded.

Screening, vehicle access, parking and security bollards will extend past the perimeter of the substation. There will also be an external yard with electrical equipment at one end of the building.

The substation will access power through the street overhead power lines already running along the road reserve, therefore the electromagnetic emissions from the substation are not expected to be greater than the levels already produced by the power lines in the area.

All electrical equipment within the new substation complies with state and national standards and, as with the installation of substations across the metropolitan network, poses no risk to surrounding residents.

The substation will access power through the street overhead power lines already running along the road reserve, therefore the electromagnetic emissions from the substation are not expected to be greater than the levels already produced by the power lines in the area.

All electrical equipment within the new substation complies with state and national standards and, as with the installation of substations across the metropolitan network, poses no risk to surrounding residents.