1 March 2016
Background and objectives
The Level Crossing Removal Project (LXRP) is removing 50 dangerous and congested level crossings across Melbourne. The Caulfield to Dandenong package of works will remove 9 level crossings along the Caulfield to Pakenham rail corridor and will also rebuild stations at Carnegie, Murrumbeena, Clayton, Hughesdale and Noble Park and upgrade power and signalling.
The plans for the Caulfield to Dandenong corridor involve the construction of sections of elevated rail line, with the areas beneath and adjacent to the train line opening up for other land use (such as gardens, parks, running tracks and other community facilities).
LXRP has been conducting a range of community consultation activities, including direct 1:1 meetings with residents along the corridor and a series of consultation sessions for local residents to attend and put forward their views about the proposed development. This study will contribute to this consultation exercise being conducted by LXRP.
Objectives
A key objective of the broader stakeholder engagement activities conducted by LXRP is 'to allow the greatest number of community members and stakeholders the opportunity to provide feedback about the level Crossing Removal Project: Caulfield to Dandenong'.
The purpose of this research is to gather an independent, representative picture of the broader community sentiment towards the 9 level crossing removals, considering the proposed elevated rail designs. The research will feed into the project's broader consultation exercise and be considered in the planning submission.
The overarching aim of the research is:
To assess community sentiment towards the proposed Caulfield to Dandenong elevated train line project that will result in the removal of 9 level crossings.
The research was required to include 3 audiences:
- Traders in the vicinity of the proposed elevated train line
- Commuters who use the Pakenham train line
- The general public in the Caulfield to Dandenong corridor
To view the full report, please open the PDF file.
If you require assistance in accessing or understanding this report, please contact us via email or call 1800 105 105.