19 August 2022
We’re removing the dangerous and congested level crossing at Mt Derrimut Road by elevating the rail line over the road and building a brand new Deer Park Station and bus interchange.
After thorough planning and technical investigations, as well as community consultation, the final designs maximise active transport links and improve connections for the Deer Park community.
The accessible new hub combines different modes of transport including bus, train, car, pedestrian and bike within one precinct, allowing passengers to easily and safely connect to Melbourne’s CBD, surrounding suburbs and regional areas.
We acknowledge and pay our respects to the Wurundjeri Woiwurrung Cultural Heritage Aboriginal Corporation and thank them for their collaboration on the Deer Park Station and precinct design.
The level crossing will be gone and the new Deer Park Station open by 2024.
Your new Deer Park Station and transport hub features
- Better connectivity for pedestrians and cyclists via Mt Derrimut Road, Railway Parade, Hemsley Drive and Eagle Way
- A brand-new train station, accessible from both sides of the rail line
- A multi-bay bus interchange
- Two modern, elevated platforms with lifts, ramps and stairs
- Extensive landscaping throughout the precinct with 500 new trees, native grasses, wildflowers and rooftop garden areas
- Pick-up and drop-off zones on both sides of the rail line
- Two spacious, landscaped forecourts
- A secure bike storage Parkiteer and 26 new bike hoops
- Weather protected ramps, stairs and platforms and an enclosed, air-conditioned waiting room provide shelter
- Pathways, lighting and security cameras throughout the precinct
- 150 new and upgraded car parks as part of the Car Parks for Commuters program
