15 October 2026

In October, we asked the Ruthven Street, Macleod community to provide feedback on the proposed landscaping plans for Rosanna Parklands, Ellesmere Parade and surrounding areas, including preferred plant species and opportunities to enhance local biodiversity.

We have worked with Banyule City Council's Urban Forestry team, along with the project's urban designers and landscape architects, to develop a proposed planting palette for Rosanna Parklands, Ellesmere Parade and surrounding areas.

The proposed planting prioritises indigenous and native species that are suited to the local environment, are drought tolerant and low maintenance, and will help create new habitat for local wildlife.

Indigenous plants are species that naturally occurred in the area before development, while native plants are Australian species from other parts of the country. Both contribute to greener, more resilient landscapes, with indigenous species playing an important role in supporting local biodiversity and reflecting the area's natural character.

A mix of trees, shrubs, flowering plants, grasses and groundcovers will create layered planting that supports wildlife habitat, improves visual amenity and helps to screen the rail corridor.

Here is a list of the preferred species we are considering including in the landscaping.

When planting areas we consider:

  • how these spaces are used
  • safe sightlines
  • maintenance requirements
  • suitability for the local environment.

Please note that while we have taken care to provide the most accurate information and ensured availability of plants, species are subject to change.


Preferred species list

Grasses and groundcovers

Botanical name

Common name

Size at maturity

Origin

Atriplex semibaccata

Berry Salt-bush

Height: 0.15m - 0.30m

Spread: 1m-2m

Indigenous

Carex tereticaulis

Basket Sedge

Height: 0.6m

Spread: 0.6m

Indigenous

Chrysocephalum apiculatum

Desert Flame

Height: 0.3m

Spread: 0.5m

Indigenous

Correa reflexa prostrate

Common Correa, prostrate form

Height: 0.6m

Spread: 0.6m

Indigenous

Dianella revoluta var. revoluta

Spreading Flax-lily

Height: 0.75m

Spread: 0.6m

Indigenous

Dichelachne crinita

Long Hair Plume Grass

Height: 0.5m

Spread: 0.5m

Indigenous

Ficinia nodosa

Knobby Club-rush

Height: 0.6m

Spread: 0.6m

Indigenous

Hardenbergia violacea prostrate

Purple Coral-pea

Height: 0.3-0.8m

Spread: 0.6-1.0m

Indigenous

Juncus subsecundus

Finger Rush

Height: 0.5m

Spread: 0.5m

Indigenous

Lolium perenne

Perennial rye grass

N/A

Exotic

Lomandra longifolia “Tanika”

Mat Rush

Height: 0.6m

Spread: 0.6m

Native cultivar

Microlaena stipoides

Weeping grass

N/A

Indigenous

Myoporum insulare prostrate

Boobialla

Height: 0.3m

Spread: 1m-1.5m

Indigenous

Poa labillardierei

Common Tussock Grass

Height: 0.6m

Spread: 0.5m

Indigenous

Rytidosperma caespitosum

Common Wallaby Grass

Height: 0.2m

Spread: 0.3m

Indigenous

Themeda triandra

Kangaroo Grass

Height: 0.3m

Spread: 0.6m

Indigenous

Shrubs

Botanical name

Common name

Approximate size at maturity

Origin

Acacia acinacea

Gold Dust Wattle

Height: 1.5m

Spread: 1.5m

Indigenous

Bursaria spinosa ssp. spinosa

Sweet Bursaria

Height: 4m

Spread: 2.5m

Indigenous

Cassinia aculeata

Common Cassinia

Height: 2-4m

Spread: 2-3m

Indigenous

Correa reflexa

Common Correa

Height: 1.2m

Spread: 1.2m

Indigenous

Enchylaena tomentosa

Ruby Salt-bush

Height: 0.6m

Spread: 0.6m

Indigenous

Goodenia ovata

Hop Goodenia

Height: 0.5m

Spread: 1.0m

Indigenous

Melicytus dentatus

Tree Violet

Height: 3.5m

Spread: 2m

Indigenous

Olearia ramulosa var. ramulosa

Twiggy Daisy-bush

Height: 0.5m - 2m

Spread: 1m

Indigenous

Prostanthera lasianthos

Victorian Christmas Bush

Height: 4m

Spread: 2m

Indigenous

Pimelea nivea

Snowy Pimelea

Height: 0.5m - 1.5m

Spread: 0.5m - 1m

Indigenous

Indigofera australis

Austral indigo

Height: 1.2m

Spread: 1.2m

Indigenous

Trees

Botanical name

Common name

Approximate size at maturity

Origin

Acacia melanoxylon

Blackwood

Height: 15m

Spread: 7m

Height at installation: 2.2m

Indigenous

Allocasuarina littoralis

Black She-oak

Height: 12m

Spread: 7m

Height at installation: 2.2m

Indigenous

Callistemon citrinus x viminalis

Harkness Bottlebrush

Height: 4m

Spread: 3m

Height at installation: 1.8m

Native cultivar

Eucalyptus leucoxylon ‘Euky Dwarf’

Dwarf Yellow Gum

Height: 7m

Spread: 4-5m

Height at installation: 2.2m

Native cultivar

Eucalyptus mannifera ‘Little Spotty’

Dwarf Spotted Gum

Height: 5-7m

Spread: 5m

Height at installation: 2.2m

Native cultivar

Eucalyptus ovata

Swamp Gum

Height: 10m

Spread: 5m

Height at installation: 2.2m

Indigenous

Eucalyptus polyanthemos

Red Box

Height: 12m

Spread: 5m

Height at installation: 2.2m

Indigenous

Geijera parviflora

Wilga

Height: 5-10m

Spread: 6-9m

Height at installation: 1.8m

Native

Hakea laurina

Pincushion Hakea

Height: 5m

Spread: 4m

Height at installation: 1.8m

Indigenous