31 October 2018
Below is a summary of the information in this document. To read the full document, open the PDF file. If you require an accessible version of this document, please request one via our contact us form.
Construction is underway to build the new Parkville Station, which will connect the world-class education, health and research precinct to the rail network for the first time.
A project of the size and scale of the Metro Tunnel cannot be built without some impact on the surrounding area.
We recognise there are a number of sensitive receivers located close to the Grattan Street construction site, including residential, educational, medical and research facilities, and we are committed to minimising the impacts of construction as much as possible.