12 May 2022
Below is a summary of the information in this document. To read the full document, open the PDF file. If you require an accessible version of this document, please request one via our contact us form.
A tunnel boring machine (TBM) is the machine used to excavate tunnels. TBMs can bore through a variety of ground conditions, from hard rock to sand.
Four TBMs were used to create the Metro Tunnel's twin 9km tunnels. Each TBM was 7.28m in diameter, weighed more than 1100 tonnes and reached 120m in length.