20 June 2024

Below is a summary of the information in this document. To read the full document, open the PDF file. If you require an accessible version of this document, please request one via our contact us form.

First Nation artist and Barkindji man Kent Morris has created an artwork for the South Yarra Siding Reserve.

Kent Morris was selected by the arts advisory panel to develop artwork that responds to the rich cultural heritage of the area and concepts of moving on Country.

Titled Where We Walk, the central source of cultural inspiration for the design is the association of the site with stone knapping and the significant flaked stone artefacts uncovered at the place that speaks to its long connection with the Wurundjeri people.

Give us feedback

Close