22 September 2026

North East Link will take up to 15,000 trucks off local roads every day and reduce travel times by up to 35 minutes.

The ventilation system for the 6.5km tunnels from Watsonia to Bulleen includes two ventilation structures and one emergency exhaust. It has been designed according to stringent air quality standards to protect the health of communities and drivers using the tunnels.

Construction is underway on the southern ventilation structure, located on Bulleen Road near the Eastern Freeway.

The ventilation system works by drawing in fresh air from the tunnel entry, which is then pushed through the tunnel by the movement of vehicles and jet fans. Before the tunnel exit, air is pushed up and out of the tunnel through a ventilation structure and into the atmosphere where it mixes with fresh air. There are no emissions from the tunnel portals where vehicles enter and exit.

The southern ventilation structure is surrounded by the Yarra Link green bridge – connecting the Koonung Creek Trail to Bulleen Park.


Visit the project team: Watsonia Hub, 17 Watsonia Road.

Yarra Link green bridge

A two-hectare green bridge over Bulleen Road will be planted with indigenous trees, grasses and shrubs. Pockets of open space will provide a bike and walking trail, fitness station and place to stop, rest and enjoy views of the Yarra River.

Local access

A new road will provide access to the Marcellin and Trinity playing fields, with new pathways and planting.

New signalised intersections to the north and west of the Yarra Link green bridge will provide safe access to Bulleen Park for students, pedestrians, cyclists and vehicles.

Construction

The southern ventilation structure is taking shape over Bulleen Road and will reach its maximum height of 51 metres once complete.

We will continue to work closely with residents and share regular updates about construction progress.

What you'll see

Construction of the ventilation structure and Yarra Link green bridge will involve large equipment and machinery, including a tower crane and concrete pumps.

Environment and community

Road tunnels can help reduce air pollution by moving traffic off roads where people live and work. In tunnels, vehicle emissions can be controlled and dispersed more effectively, and monitored to ensure standards are met.

Research from around the world shows emissions from well-designed tunnel ventilation systems have no measurable effect on local or regional air quality.

Whether you’re walking, riding or spending time on the Yarra Link green bridge near the ventilation structure, it’s been designed to be a safe and enjoyable space for everyone.

Monitoring

Air quality is monitored during construction and will be monitored inside and outside of the tunnels once North East Link opens to traffic.

Air quality monitoring stations have been set up in the project area to understand current local conditions.

The location of the air quality monitoring stations were established in consultation with Victoria’s Environment Protection Authority (EPA).

Air quality results will be published on the project website in 2027.

contact@bigbuild.vic.gov.au | 1800 105 105


For languages other than English please call 9209 0147.

If you need assistance due to a hearing or speech impairment, contact Relay Service.