27 November 2024

Below is a summary of the information in this document. To read the full document, open the PDF file. If you require an accessible version of this document, please request one via our contact us form.

Planning SRL East Precincts:  Guidelines for the preparation of Structure Plans

Summary of Guidelines

The purpose of these Guidelines is to guide the preparation and assessment of Structure Plans within the Structure Plan Areas.

Separate Structure Plans will be prepared for each Structure Plan Area within the SRL East Planning Areas located around the Cheltenham, Clayton, Monash, Glen Waverley, Burwood and Box Hill SRL East stations.

The Guidelines are directed to ensure that structure planning is premised on a sound strategic footing having regard to the established and strengthened strategic policy context, strong residential and employment population projections, and logical spatial planning which focuses opportunities for densification into sub-areas, having regard to sound urban design outcomes.

Give us feedback

Close