24 October 2022
Below is a summary of the information in this document. To read the full documents, open the PDF file. If you require an accessible version of this document, please request them via our contact us form.
Summary of SRL East Public Open Space Framework
The purpose of the Public Open Space Framework (POSF) is to guide the process of managing the effects of the rail and infrastructure components of the Suburban Rail Loop (SRL) East (also referred to as ‘the Project’) on public open space through:
- The identification of principles and actions for the Project to mitigate effects on public open space having regard to the SRL Urban
 Design Strategy;
- A process to ensure that potential effects and mitigations are considered by the Public Open Space Advisory Panel (POSAP);
- The preparation of specific Public Open Space Management Plans (POSMPs).