15 November 2024
Our city and state are growing. Melbourne will be a city of 9 million people by the 2050s – the size of London today. We need more transport and more homes in the right places — and Suburban Rail Loop (SRL) will deliver both. Construction of SRL East is powering ahead, with trains taking passengers by 2035 — slashing travel times, easing congestion and creating thousands of local jobs.
SRL East from Cheltenham to Box Hill will deliver six brand new underground stations, opening up access to health, education and employment destinations across Melbourne’s east and south east.
A Stabling Facility is required near the start of the line to allow SRL's fleet of new high-tech trains to begin services efficiently each day. The Stabling Facility will be built at 91-185 Kingston Road, Heatherton.
The dedicated Stabling Facility is a critical part of SRL East. It would not be possible to provide high frequency 'turn-up-and-go' train services for passengers without it.
The Stabling Facility will house the operational control centre for the new railway line and is also where the train fleet will be stored and maintained when not in service.
A network support facility will be built as part of the Stabling Facility to provide power during construction and operation of SRL East.
Construction of the Stabling network support facility
We are building a network support facility in the south east corner of the SRL East Stabling Facility at Heatherton.
The network support facility will be a mostly self-contained, unstaffed building containing electrical equipment that converts the local power supply into the voltage and type of current needed to power the tunnel boring machines during construction. Once construction of the tunnels is complete the network support facility will be reconfigured to provide power for operation of the SRL East network.
Urban Design and Landscape Plan
As part of the planning process an Urban Design and Landscape Plan (UDLP) is required to be prepared to the satisfaction of the Minister for Planning in accordance with the SRL East Incorporated Document August 2022 (Incorporated Document) before construction of permanent above ground buildings can begin.
The UDLP presents the proposed building and landscape design for the permanent above ground 66kV network support facility structure.
This UDLP is limited to the building housing the 66kV electrical equipment, with all other buildings and structures being reconfigured to support the operation of SRL East. Feedback from community consultation was considered in the final Stabling network support facility UDLP submitted to the Minister for Planning in accordance with the requirements. The UDLP has now been approved.
What we heard - Stabling network support facility
We consulted on the network support facility from 20 February to 20 March 2024.
We asked for feedback on a range of topics including design, external treatments and landscaping. Community feedback was collected via a survey on Engage Victoria.
To support this engagement, we provided information on the Stabling network support facility 66kV building via:
- An advertisement in the Herald Sun
- A social media post on Facebook
- A postcard distributed to approximately 1600 properties in the vicinity of the Stabling Facility.
Community engagement snapshot
- 26 survey responses
- Social media posts reaching more than 14,000 people
- Almost 900 unique visitors to the Engage Victoria site
- More than 75% of the respondents live nearby.
We heard from a range of age groups
Percentage | Survey participants by age group. |
---|---|
4% | Less than 18 years old |
15% | 18-34 years old |
46% | 35-49 years old |
12% | 50-65 years old |
23% | Older than 65 years. |
Community feedback
We’d like to thank the community for providing their feedback to help inform the final plan for the Stabling network support facility 66kV building.
Areas of interest
A summary of key feedback themes identified in responses to the Engage Victoria survey is included below. Feedback not directly related to the UDLP was collated and will inform future considerations as relevant.
Structure design
What we heard.
Respondents told us | Our response |
---|---|
|
|
Structure colours
Respondents told us | Our response |
---|---|
|
|
Visual amenity
Respondents told us | Our response |
---|---|
|
|
Landscaping
Respondents told us | Our response |
---|---|
|
|
Operational noise
Respondents told us | Our response |
---|---|
|
|
Next steps
All feedback provided was considered and informed the final UDLP, which was endorsed by the Minister for Planning on 19 July 2024. Construction on the above ground 66kV building for the Stabling network support facility is planned to begin in October 2024.