Aerial view of Noble Park, looking south west
Aerial view of Corrigan Road level crossing
The gantry crane at Murrumbeena
The straddle carrier installing spans along the rail corridor
Poath Road, Murrumbeena in the foreground
The elevated rail over Murrumbeena Road