/
The new road bridge at Grange Road in Alphington
The level crossing at Grange Road in Alphington was removed by lowering a rail trench beneath the road
The eastern side of the rail trench, bordered on the north by a new shared user path
Looking at the new Grange Road rail trench from east to west
A second rail bridge has been installed over Burgundy Street in Heidelberg
As part of the Hurstbridge Rail Line Upgrade, we've added a second set of tracks between Heidelberg and Rosanna stations
The new elevated Rosanna Station opened in May 2018
The Lower Plenty Road level crossing was removed by raising the rail line above the road
The new elevated rail line and station in Rosanna