How do you decide where right turn access over a median is allowed?

Extra lanes added on Craigieburn Road between Hume Highway and Mickleham Road as well as upgraded intersections and better walking, cycling and public transport connections in Craigieburn.

In general, uncontrolled median breaks are not provided unless there are specific emergency access or functional requirements.

The location and design of access points must consider the following:

  • volume of traffic
  • type of traffic
  • function of the road
  • use (emergency access and specific functional requirements).

The design of the road upgrade and access management approach must comply with VicRoads and AustRoads guidelines.