Completed in 2024

How do you determine the best locations for breaks and U-turn bays?

Extra lanes added on Craigieburn Road between Hume Highway and Mickleham Road as well as upgraded intersections and better walking, cycling and public transport connections in Craigieburn.

The location of an intersection is primarily determined by the existing road network and the needs of surrounding property development.

It is desirable that median access points are located on straight and generally flat sections of road.

Other factors also include:

  • transport needs for the network.
  • driver and pedestrian line of sight distance requirements.

Give us feedback

Close

Give us feedback

Close