Feedback quotes

“An upgrade will facilitate better flow of traffic along the east west corridor linking the Dandenong area with the Freeway and local Mordialloc region.”

“There needs to be a better connection from the Keys in Keyborough, Braeside Park and Waterways for walking and cycling - we have young children and we don’t feel safe in this area on our bikes.”

“A high priority should be given to preserve all the habitats for the wildlife. The preservation of the unique quiet natural environment that is highly valuable in Braeside Park for the public to enjoy.”

“There is nothing at all safe being a pedestrian as there is no footpaths or safe areas to cross Governor Road. There are bus stops along there, but there are no safe areas for passengers to wait or disembark.”

“The roundabout at Boundary Road is often difficult and dangerous to navigate. I have witnessed accidents there and have often felt in danger as I navigate around it from all 4 entry points.”

“With 2 lanes and then 1 lane, there are always drivers speeding and pushing in just to get a few cars ahead. It is like waiting for someone to hit you when the road goes from 2, to 1, to 2, to 1 lane.”

“During peak hours, the roundabout is dreadful. It slows down traffic and is accident prone. With the traffic volume increasing, it’s time to upgrade with traffic lights.”

“It’s currently a single lane used by all motorists and there are some heavy vehicles that cause a lot of congestion.”

Give us feedback

Close

Give us feedback

Close