18 May 2026
Anderson Street is one of 5 level crossings being removed in Melbourne’s inner west, helping to make the Werribee Line level crossing free.
We’re closing the Anderson Street, Yarraville level crossing and building 2 new pedestrian and cycling underpasses to keep the community connected.
This brochure explains the key considerations of the design solution, including technical and engineering constraints and community feedback.
View the report by downloading the PDF (6.5MB).
If you require assistance in accessing or understanding this report, please contact us at levelcrossings@bigbuild.vic.gov.au or call 1800 105 105.