18 May 2026

We're getting rid of five level crossings in Melbourne's inner west – in Newport, Altona, Spotswood and Yarraville – boosting safety and easing congestion.

We’re removing the Hudsons Road, Spotswood level crossing with a rail bridge and building a brand-new Spotswood Station with modern facilities for passengers.

This brochure explains the key considerations of the design solution, including technical and engineering constraints and community feedback.

View the report by downloading the PDF (15.2MB).

If you require assistance in accessing or understanding this report, please contact us at levelcrossings@bigbuild.vic.gov.au or call 1800 105 105.