13 February 2024

Below is a summary of the information in this document. To read the full document, open the PDF file. If you require an accessible version of this document, please request one via our contact us form.

Parkville Station will provide train access for the first time to Victoria’s world-renowned education, health and research precinct and relieve pressure on local trams and roads.

The station’s main entrance will feature a 50m-long steel and glass canopy and light wells, filling the underground station with natural light.

Parkville Station is under Grattan Street between Royal Parade and Leicester Street, with 2 entrances on Grattan Street outside The University of Melbourne – one at the corner of Royal Parade and one opposite Barry Street.

The station will include a pedestrian walkway underneath Royal Parade that will take passengers to two more entrances – one outside the Royal Melbourne Hospital and one outside Peter MacCallum Cancer Centre.

Learn more about Parkville Station.