10 December 2024

Below is a summary of the information in this document. To read the full document, open the PDF file. If you require an accessible version of this document, please request one via our contact us form.

This guide is intended to be used to raise awareness of the opportunities to use lower carbon materials to reduce upfront carbon emissions associated with transport infrastructure projects. The guide should be used together with advice from suppliers and in consultation with returned asset owners.

Large infrastructure projects, such as those resulting from Victoria’s Big Build present a unique opportunity to influence decarbonisation of the construction sector. By leveraging this unprecedented investment it is possible to optimise existing lower carbon technologies and identify and remove barriers to innovation.

This visual guide is intended to support the uptake of lower carbon materials in alignment with the VIDA Transport Infrastructure Decarbonisation Strategy.

Help us improve the website by completing a short survey

Close