Completed in 2019

Mural

Chandler Highway Upgrade

A 60-metre long mural, painted by local and Wurundjeri artists (Ash Firebrace and Tom Civil) is featured on the Chandler Highway bridge underpass. The underpass links the Main Yarra Trail from east to west on the Eastern Freeway (south) side of the Yarra River.

The mural depicts the story of how the Yarra River was formed (as told by Barak), featuring local flora and fauna.

Watch the video to see how the mural came together.

Give us feedback

Close

Give us feedback

Close