UNDER CONSTRUCTION

Structures Rehabilitation Package

We'll replace, repair, strengthen and rehabilitate bridges and culverts across Melbourne’s north and south-east

The Structures Rehabilitation Package will replace, repair, strengthen and rehabilitate 11 bridges and culverts (structures) across Melbourne’s north and south-east and upgrade barriers to increase safety. The structures have been identified as priority locations for works as part of long-term maintenance of the road network.

Structure locations

Northern suburbs:

  • Barry Road over Craigieburn rail line near Coolaroo - complete
  • Donnybrook Road near Donnybrook - complete
  • Plenty Road over Barbers Creek at Yan Yean - complete
  • Plenty Road over Mernda Drain at Mernda - complete
  • Wallan Road near Whittlesea - complete
  • Whittlesea-Yea Road near Whittlesea - complete.

South-east:

  • South Gippsland Highway over Bunyip River near Tooradin - complete
  • South Gippsland Highway over Eumemmerring Creek at Dandenong South
  • South Gippsland Highway over Hallam Main Drain at Dandenong South
  • South Gippsland Highway over Moodys Inlet near Tooradin - complete
  • South Gippsland Highway over Muddy Gates Creek near Tooradin - complete.

Watch our video below covering the bridges being upgraded.

Removal and replacement

In some cases, the works include:

  • removing the existing bridge structure
  • replacing it with a new one
  • installing new safety barriers
  • laying a new road surface.

Rehabilitation

At other locations, the bridge structures will be rehabilitated to improve the lifespan of the structure by:

  • removing the existing surface
  • making the structure stronger with additional steel or concrete
  • laying a new road surface.

Cathodic protection

We’ll also undertake cathodic protection works at 2 locations, which helps to protect against corrosion. Watch our video for more information on this process.

Help us improve the website by completing a short survey

Close

Help us improve the website by completing a short survey

Close