Audio Type: Upbeat instrumental background music with ambient traffic sound effects. No spoken voiceover narration; information is communicated visually via graphics, 3D animated overlays, and camera footage.
Visual Description: Title card animation displaying the project title on a dark background. Upbeat instrumental music begins.
On-screen text:
- Travelling Along Grimshaw Street
- Greensborough & Watsonia Upgrades
Visual Description: Dashcam and aerial camera view travelling east along Grimshaw Street toward the Greensborough Highway intersection, showing existing traffic queues and surrounding commercial buildings.
On-screen text:
- Grimshaw Street, Greensborough
- Major connection between M80 Ring Road and North East Link
Visual Description: Transition to a 3D architectural graphic overlay depicting the new Grimshaw Street bridge over the Hurstbridge rail line and Greensborough Highway corridor.
On-screen text:
- Rebuilding and widening the Grimshaw Street bridge
- Extra lanes to improve traffic flow and connection to M80 Ring Road
Visual Description: Animated perspective moving through the new signalised interchange layout, highlighting dedicated turn lanes and upgraded traffic lights at the Grimshaw Street intersection.
On-screen text:
- New Grimshaw Street interchange
- Direct access to express and local traffic lanes
Visual Description: Camera pans along the rail corridor beneath Grimshaw Street, showing the extended rail tunnel visualisation for the Hurstbridge Line.
On-screen text:
- Extended rail tunnel under Grimshaw Street
- Nearly 500m extended rail tunnel on the Hurstbridge Line
Visual Description: Ground-level view showing cyclists and pedestrians using newly built shared user paths and underpasses near Grimshaw Street.
On-screen text:
- New walking and cycling paths
- Safe pedestrian underpass at Grimshaw Street
Visual Description: Time-lapse camera rendering showing smooth traffic movement along Grimshaw Street across the expanded bridge and through the upgraded interchange.
On-screen text:
- Quicker, safer local trips for Greensborough and Watsonia
- Easing congestion across Melbourne's north-east
Visual Description: Closing screen featuring official project partner logos and website details as the instrumental music fades out.
On-screen text:
- Victoria's Big Build
- Australian Government – BUILDING AUSTRALIA
- VICTORIA State Government
- bigbuild.vic.gov.au