COMPLETED in 2024

Structures Rehabilitation Package

We replaced, repaired, strengthened and rehabilitated bridges and culverts across Melbourne’s north and south-east.

The Structures Rehabilitation Package replaced, repaired, strengthened and rehabilitated bridges and culverts (structures) across Melbourne’s north and south-east and upgrade barriers to increase safety. The structures were identified as priority locations for works as part of long-term maintenance of the road network.

Structure locations

Northern suburbs:

  • Barry Road over Craigieburn rail line near Coolaroo
  • Donnybrook Road near Donnybrook
  • Plenty Road over Barbers Creek at Yan Yean
  • Plenty Road over Mernda Drain at Mernda
  • Wallan Road near Whittlesea
  • Whittlesea-Yea Road near Whittlesea

South-east:

  • South Gippsland Highway over Bunyip River near Tooradin
  • South Gippsland Highway over Moodys Inlet near Tooradin
  • South Gippsland Highway over Muddy Gates Creek near Tooradin.

Removal and replacement

In some cases, the works included:

  • removing the existing bridge structure and replacing it with a new one
  • installing new safety barriers
  • laying a new road surface.

Rehabilitation

At other locations, the bridge structures were rehabilitated to improve the lifespan of the structure by:

  • removing the existing surface
  • making the structure stronger with additional steel or concrete
  • laying a new road surface.

Cathodic protection

We also undertook cathodic protection works at 2 locations, which helped to protect against corrosion. Watch our video for more information on this process.