Ballan Road Intersection Upgrade
Shop to the Top Competition
Terms and Conditions
VIDA Roads, the Promoter, is upgrading the intersection of Ballan, Greens and McGrath roads in Wyndham Vale. There will be changed traffic conditions during 2026 as major works progress.
“Shop to the Top” is a competition (Promotion) to encourage local families to continue to visit businesses at the Ballan, Greens and McGrath roads roundabout as major works to upgrade the intersection progress. The competition is designed to also benefit local schools.
How you can make a difference
We are inviting local Wyndham Vale schools within a circumference of the Ballan, Greens and McGrath roads roundabout to compete for a significant cash prize. For each dollar spent at participating stores, you will contribute one point for your chosen school.
All members of the public can participate by shopping at these stores and assigning their points to their preferred school among the list of participating schools.
No minimum spend is required. Every purchase, big or small, helps your chosen school. To submit your entry for proof of purchase, take a photo of your receipt and complete our easy online form.
Competition details
The " Shop to the Top" competition runs for approximately twelve weeks, from 6am Monday 11 May 2026 to 11pm Friday 31 July 2026.
The winning school will be awarded a $5,000 cash prize.
The winning school must use the prize money for equipment or improvements that benefit the school community and align with the public benefit purpose of this initiative.
By shopping local, you're not only supporting businesses at the Ballan, Greens and McGrath roads roundabout but also investing in the future of our local schools. Let's build a brighter future, together!
Participating Stores
The following Traders will be participating in the promotion (Participating Store/s):
- Big Nick’s Pizza and Kebab
- Domino’s Pizza
- Fresh Chilli Thai Restaurant
- Jasbe BP Wyndham Vale
- Pho Holic
- Snack India
- Subway
Participating Schools
The following schools will be participating in the promotion (Participating School/s):
- Iramoo Primary School\
- Riverbend Primary School
- Thomas Chirnside Primary School
Terms & Conditions
1. These terms and conditions are for all entrants who enter the Ballan Road Intersection Upgrade “Shop to the Top” Competition (Promotion). Participation in this Promotion is deemed acceptance of these Terms and Conditions.
2. The Promoter is VIDA Roads, a division of the Victorian Infrastructure Delivery Authority, an administrative office in relation to the Department of Transport and Planning (ABN 69 981 208 782), whose principal office is at Level 21, 180 Lonsdale Street, Melbourne VIC 3000.
3. This Promotion commences at 6am Monday 11 May 2026 and concludes at 11pm Friday 31 July 2026, (Promotion Period).
4. Each full dollar spent by a customer will allow that customer to earn points towards a school. A customer will be requested to assign their points to a school of their preference among the list of participating schools.
5. For every full dollar spent by a customer, one point is awarded towards the school of their choice. Dollars will be rounded down to create points. For example: $2.05 = 2 points and $3.99 = 3 points
5a. UPDATE: From Monday 13 July 2026, for every full dollar spent by a customer, 10 points will be awarded towards the school of their choice. Dollars will be rounded down to create points. For example: For example: $2.05 = 20 points and $3.99 = 30 points
Prizes
6. The winning school with the highest spend/points per student will be awarded a $5,000 cash prize.
- The average spend per student will be calculated on the following basis:
Total Points ÷ Number of students
7. In the event of a tie between schools, the prizes will be distributed evenly between each winner.
Use of Prize
8. The winning school must use the prize money for resources or school improvements, aligning with the initiative's purpose. An acquittal process will be initiated following the Promotion’s conclusion.
Participation process
9. There is no entry or participation cost for a customer to participate in the Promotion.
10. A customer can make an unlimited number of purchases during the Promotion Period and contribute points to a school.
11. To enter this Promotion, a customer must purchase goods or services instore at a Participating Store during the Promotion Period.
12. There is no minimum spend required by a customer to contribute points to allocated schools.
13. A customer can contribute points to their allocated school using the following methods:
- scan a unique QR code prominently displayed at the point of sale in participating shops. This QR code links directly to a secure, mobile-friendly online entry form
- complete the online form, which requires:
- Date of purchase
- Total receipt amount
- Store they purchased goods or services from (selected from a predefined dropdown list of Participating Stores)
- School they wish to support (selected from a predefined dropdown list of Participating Schools)
14. The Ballan Road Intersection Upgrade team will undertake a weekly verification process of all submitted online forms and receipt photos to ensure consistency between the amount listed and the amount spent.
15. Each participating school will receive promotional material for display in a prominent location, along with digital assets for use on social media or for internal communications (e.g., school reception, library, compass etc).
16. Participating schools are strongly encouraged to promote the Promotion to ensure adequate participation.
17. The Ballan Road Intersection Upgrade team will maintain an accurate, up-to-date digital tally of points for each school. Weekly updates will be provided to schools showing the current leaderboards with the highest spend/points per student.
Winner notification
18. The winning school will be advised in writing and be provided with details of how to collect the Prize.
19. The Promoter is not responsible for any costs associated with collection of the Prize.
20. VIDA Roads will publish the name of the winning school on the Promotion’s webpage or other VIDA Roads channels including social media.
General
21. The Promoter reserves the right to cancel all or any part of the Promotion at any time.
22. The Promoter is not responsible for the condition/quality of any goods or services offered by a Participating Store in relation to the Promotion.
23. The Promoter reserves the right, at any time, to verify the validity of entries (including contacting Participating Stores); and disqualify an entry that is not in accordance with these Terms and Conditions.
24. Failure by the Promoter to enforce any of its rights at any stage does not constitute a waiver of those rights.
25. Any additional expenses incurred by Participating Schools other than those outlined in these Terms and Conditions, are the responsibility of the Participating Schools.
26. The Promoter accepts no responsibility whatsoever for late, misplaced, lost or ineligible entries. The Promoter will not be liable for any loss or damages whatsoever (including but not limited to indirect or consequential loss) or for any personal injury suffered or sustained in connection with the Promotion, except for any liability which cannot be excluded by law.
27. The Promoter’s inclusion of a Participating Store in the Promotion does not mean that the Promoter in any way warrants or makes any representations as to the feasibility of, or assumes responsibility for, or has any obligations in relation to, the goods or services offered by the Participating Store.
Privacy
28. Personal information collected, used and disclosed in connection with the Promotion is subject to the Promoter’s Privacy Policy, available at https://bigbuild.vic.gov.au/privacy
Force Majeure
29. If for any reason the Promotion is not capable of running as planned (including due to infection by computer virus, bugs, tampering, unauthorised intervention, fraud, technical failures or any other causes beyond the control of the Promoter, which corrupts or affect the administration, security, fairness, integrity or proper conduct of this Promotion) the Promoter reserves the right, in its sole discretion, to take any action that may be available, and to cancel, terminate, modify or suspend the Promotion. In the case of the intervention of any outside agent or event which naturally changes the result or prevents or hinders its determination, including but not limited to vandalism, power failures, tempests, natural disasters, acts of God, civil unrest, strikes; the Promoter may in its absolute discretion cancel the Promotion. The Promoter reserves the right to modify these Terms and Conditions at any time and to cancel or amend the Promotion at any time without notice.