M80 Ring Road Completion - Backyard tree planting program

The Program is being run on behalf of the State of Victoria through Major Road Projects Victoria (MRPV), a division of the Victorian Infrastructure Delivery Authority (VIDA), an administrative office in relation to the Department of Transport of Planning, of Level 25, 180 Lonsdale Street, Melbourne ABN 69 981 208 782.

By entering into the Program, you agree to the following terms and conditions:

  1. There is no entry or participation cost to participate in the Program.
  2. There will be a total of 1000 trees made available as part of the Program to Eligible Residents.
  3. The Promotion commences from 9:00am 24 June 2024 and concludes once all 1000 trees have been allocated as part of Program (Program Period).
  4. Throughout the Program Period, Eligible Residents will be able to register for the Program and receive up to three trees for their specified residential address. Only one registration per Eligible Resident will be allowed, limited to one residential address only per registration. Duplicate registrations will not be accepted by MRPV.
  5. Employees of MRPV or its contractors are ineligible to participate in the Program.
  6. MRPV is not responsible for the condition/quality of any goods or services offered as part of the Program.
  7. MRPV will not be liable for any loss or damages whatsoever (including but not limited to indirect or consequential loss) or for any personal injury suffered or sustained in connection with the Program, except for liability that cannot be excluded by law.
  8. MRPV reserves the right to cancel or refuse to honour a registration for the Program at their absolute and sole discretion.
  9. Personal information collected, used and disclosed in connection with the Program is subject to MRPV’s Privacy Policy available at Privacy - Victoria’s Big Build.
  10. If for any reason the Program is not capable of running as planned (including due to infection by computer virus, bugs, tampering, unauthorised intervention, fraud, technical failures or any other causes beyond the control of MRPV, which corrupts or affect the administration, security, fairness, integrity or proper conduct of this Program) MRPV reserves the right, in its sole discretion, to take any action that may be available, and to cancel, terminate, modify or suspend the Program. MRPV reserves the right to modify these Terms and Conditions at any time and to cancel or amend the Program at any time without notice.