Unacceptable behaviours guide
The Victorian Infrastructure Delivery Authority (VIDA) requires these posters to be displayed prominently on each VIDA worksite.
VIDA expects that:
- the posters are rotated within each project site to ensure that each poster is seen by as many people as possible
- the content of the posters is publicised as part of site inductions, pre-start meetings and toolbox talks.
The posters and digital assets can be downloaded below. Physical copies of the posters will be delivered to each worksite.
Download A3 posters (ZIP, 226.9 KB)
Download 1920x1080 PNG files (ZIP, 3.5 MB)
VIDA has worked in a cross-jurisdictional taskforce with its counterparts in both the Queensland and New South Wales governments to develop the unacceptable behaviours guide. The categories of unacceptable behaviours covered in the guidance relate to allegations or instances of:
- criminal behaviour
- corrupt conduct
- improper industrial activity
- workplace health and safety non-compliance.