Station features
Town Hall Station’s main concourse below City Square is a grand entrance hall with a roof supported by huge columns shaped like tree branches.
The station’s platforms are more than 25m below street level and 18m wide – among the widest underground metro platforms in the world. A spectacular 10m-high arched ceiling above the platforms features chandelier lights designed and made in Melbourne.
City Square
City Square will return to the public in 2025 as a redesigned public area in the heart of Melbourne’s CBD. The space will be landscaped with native species, and previous water features will be replaced with new architectural features that both honour the past and open up new spaces for cultural and civic activity.
The City Square entrance will reduce pedestrian congestion along Swanston Street and relieve pressure on the Flinders Street/Swanston Street pedestrian crossing.
Federation Square
The Federation Square entrance, located at the north-west corner of the square, will feature a light-filled canopy which complements the contemporary architecture of this vibrant open space.
This entrance will provide a new way to access Federation’s Square cultural events and bars and restaurants, as well as ACMI, Southbank, the Arts Centre, and St Paul’s Cathedral.
Campbell Arcade and Degraves Street subway
The historically significant Campbell Arcade is the location of an underground pedestrian connection between Flinders Street Station and Town Hall Station. The arcade’s key heritage features have been carefully preserved – including the shopfronts.
Over station development
After the station is built, a multistorey building including retail, hospitality and office spaces will be built on top of the station site near the corner of Flinders and Swanston streets. Learn more about over station development.
Accessibility
Town Hall Station includes escalators and lifts, Tactile Ground Surface Indicators, braille and tactile signs, and more accessibility features.
We've also installed lifts from the Degraves Street subway to platforms 1 to 10 at Flinders Street Station, to help people move from Metro Tunnel to City Loop services easily.
Find out about the accessibility features at all the new stations.