30 August 2022

As part of the Ringwood Level Crossing Removal Project, we’re removing level crossings at Dublin Road, Ringwood East and Bedford Road, Ringwood, which will make Ringwood level crossing free.

We’ll also build a brand-new Ringwood East Station that will feature a main concourse and second entry, platforms that are accessible by lifts and stairs, and upgraded pedestrian and cycling paths.

The Bedford Road map shows the location and some artist impressions of:

  • extent of the rail trench
  • new and existing pedestrian paths through the precinct
  • new and existing walking and cycling paths connecting the Heathmont Trail to Bedford Park
  • new and existing landscaping

This map and included artist impressions are subject to change.

Download the high-resolution PDF version (PDF, 2.7 MB) of this map.

If you require assistance in accessing or understanding this report, please contact us on 1800 105 105 or email contact@levelcrossings.vic.gov.au.