16 October 2026
Terms and Conditions have been developed online with the Victorian Commission for Gambling and Liquor Regulations conditions set out in the Gambling Regulation Act 2003 and Gambling Regulations 2015.
Ruthven Street, Macleod SMS sign-up campaign
By submitting an entry into the Ruthven Street, Macleod SMS sign-up campaign (Promotion), you are consenting to the following terms and conditions:
- The Promotion is conducted by VIDA Rail (formerly the Level Crossing Removal Project), a division of the Victorian Infrastructure Delivery Authority, an administrative office in relation to the Department of Transport and Planning, ABN 69 981 208 782 of Level 9, 121 Exhibition Street, Melbourne, Victoria 3004, 1800 105 105 (VIDA Rail).
- There is no entry fee for the Promotion.
- The Promotion is open to current residents of Victoria only.
- To validly enter the Promotion, a person must be 18 years of age or over on the date of their entry into the Promotion.
- The Promotion will run from 12:00AM AEST 15 September to 11:59PM AEDT 29 October 2026.
- Winners will be drawn on 30 October 2026.
- Entries are limited to one entry per person.
- Employees, contractors and suppliers of VIDA Rail are not eligible to enter the Promotion.
- To validly enter the Promotion, a person must sign up to the Ruthven Street, Macleod SMS notification alert by texting ‘RUTHVEN to 0428 581 917.
- By entering the Promotion, you will be added to the Ruthven Street, Macleod SMS subscriber list for local disruptions. You can opt out of the Ruthven Street, Macleod SMS subscriber list at any time by texting ‘STOP’, ‘stop’ or ‘Stop’ to 0428 581 917.
- VIDA Rail will draw winners randomly from subscribers to the Ruthven Street, Macleod SMS subscriber list for local disruptions.
- The validity of entries and selection of entries are at the sole discretion of VIDA Rail.
- VIDA Rail reserves the right to modify, suspend or cancel all or any part of the Promotion at its sole discretion.
- Winners will receive one of five $100 vouchers (Prizes) sourced from McNamara Street or Macleod Village traders. Prizes must be redeemed in accordance with any validity period and conditions specified on the voucher.
- VIDA Rail will call each winner via their SMS sign-up number to arrange a suitable time and date to deliver a voucher. If the winner is unable to be contacted after five attempted calls within a week after the draw, a replacement winner will be drawn at random. VIDA Rail will arrange a suitable time and date with each winner to deliver the voucher to them.
- Prizes are not transferable. Neither the Prizes, nor any unused part of the Prizes, can be sold, scalped, auctioned, raffled, pledged, or promoted as an incentive or reward. VIDA Rail is not liable for any Prize being lost, damaged, unavailable, uncollected or undelivered. To the extent permitted by law, VIDA Rail makes no representations or warranties as to the quality, suitability, redeemability or merchantability of the Prizes.
- Personal information is collected to enable the administration and promotion of the Promotion, including the announcement of the winners’ names on social media or other promotional materials. Personal information collected, used and disclosed in connection with this Promotion is subject to the VIDA Rail Privacy Policy.
- VIDA Rail shall not be liable for any loss or damage whatsoever which is suffered (including but not limited to indirect or consequential loss) or for any personal injury suffered or sustained in connection with the prize or the Promotion, except for any liability which cannot be excluded by law.
Spin the Wheel at the Mordialloc Community Celebration – Terms and Conditions
By participating in the Mordialloc Community Celebration Spin the Wheel Competition (Competition), you are consenting to the following Terms and Conditions:
- The Competition is conducted by VIDA Rail (formerly known as the Level Crossing Removal Project), a division of the Victorian Infrastructure Delivery Authority, an administrative office in relation to the Department of Transport and Planning (ABN 69 981 208 782) of Level 9, 121 Exhibition Street, Melbourne, Victoria 3000 (VIDA Rail).
- There is no entry fee for the Competition.
- The Competition is open to current residents of Victoria only.
- The Competition will run from 10:00am to 2:00pm on Saturday 3 October 2026 (Competition Period).
- To validly enter the Competition, a person (Entrant) must:
- attend the Mordialloc Community Celebration during the Competition Period; and
- speak with a project representative in branded VIDA Rail attire, who will administer permission to spin the wheel.
- Entrants who spin the wheel and land on the ‘Local Voucher’ wedge will receive a lucky dip instant prize of a Mordialloc Gift Card to be redeemed at Mordialloc participating traders (Local Voucher). Mordialloc Gift Cards are to the value of $10, $100, $200 or $250.
- Entrants who spin the wheel and land on a wedge other than the ‘Local Voucher’ will win a prize determined by where the clicker on the wheel lands. Prizes outside of the Local Voucher may include:
- small coffee voucher for Alby’s Deli, SupaNatrl, Siesta Café, Main Street Café or Manow Cafe;
- small hot chips voucher for Bruno’s Chicken Shop;
- $10 off voucher for Manow Café Mordialloc;
- $100 Tenabe Japanese Restaurant voucher;
- $100 Bruno’s Chicken Shop voucher and
- Mordialloc promotional merchandise.
- The total prize pool for the Prize Draw will be $9,831.70.00, consisting of Mordialloc Gift Cards, coffee vouchers, food vouchers and local merchandise.
- VIDA Rail is not liable for any prize being lost, damaged, uncollected, unavailable or undelivered. Prizes must be redeemed in accordance with any validity period and conditions specified by the relevant provider.
- An individual is allowed no more than one entry into the Competition during the Competition Period. A parent or guardian who has entered the Competition may nevertheless assist their dependent(s) to participate in the Competition.
- An Entrant cannot spin the wheel more than once.
- Employees, contractors and suppliers of VIDA Rail are not eligible to enter the Competition.
- Validity and selection of entries is at VIDA Rail's sole discretion.
- The Mordialloc Community Celebration date and times will be selected and run at VIDA Rail's discretion.
- VIDA Rail reserves the right to cancel all or part of the Competition at its sole discretion.
- Personal information is collected to enable the administration and promotion of the Competition, including the announcement of winners' names on social media or other promotional materials. Personal information collected, used and disclosed in connection with this Competition is subject to VIDA Rail Privacy Policy.
- VIDA Rail shall not be liable for any loss or damage whatsoever which is suffered (including but not limited to indirect or consequential loss) or for any personal injury suffered or sustained in connection with the prize or the Competition, except for any liability which cannot be excluded by law.
Hidden Letter Challenge at the Mordialloc Community Celebration – Terms and Conditions
By participating in the Tracks, Trains and Treasures – Hidden Letter Challenge (Competition), you are consenting to the following Terms and Conditions:
- The Competition is conducted by VIDA Rail (formerly known as the Level Crossing Removal Project), a division of the Victorian Infrastructure Delivery Authority, an administrative office in relation to the Department of Transport and Planning (ABN 69 981 208 782) of Level 9, 121 Exhibition Street, Melbourne, Victoria 3000 (VIDA Rail).
- There is no entry fee for the Competition.
- The Competition is open to current residents of Victoria only.
- The Competition will run from 10:00am to 2:00pm on Saturday 3 October 2026 (Competition Period).
- To validly participate in the Competition, a person (Entrant) must:
- attend the Mordialloc Community Celebration during the Competition Period;
- collect a Tracks, Trains and Treasures activity sheet from event staff;
- complete the Tracks, Trains and Treasures – Hidden Letter Challenge; and
- present the completed activity sheet to event staff.
- Entrants who successfully complete the Tracks, Trains and Treasures – Hidden Letter Challenge will receive an instant prize of a single kid size scoop gelato from Augustus Gelatery Mordialloc; and b. other promotional items determined by VIDA Rail.
- The total prize pool value is $550.00 inc GST consisting of 100 scoops valued at $5.50 each
- Prizes are available while stocks last.
- VIDA Rail is not liable for any prize being lost, damaged, unavailable, uncollected or undelivered.
- An individual is allowed no more than one entry into the Competition during the Competition Period. A parent or guardian who has entered the Competition may nevertheless assist their dependent(s) to participate in the Competition.
- Employees, contractors and suppliers of VIDA Rail are not eligible to enter the Competition.
- Validity and selection of entries is at VIDA Rail's sole discretion.
- The Mordialloc Community Celebration date and times will be selected and run at VIDA Rail's discretion.
- VIDA Rail reserves the right to cancel all or part of the Competition at its sole discretion.
- Personal information is collected to enable the administration and promotion of the Competition. Personal information collected, used and disclosed in connection with this Competition is subject to VIDA Rail Privacy Policy.
- VIDA Rail shall not be liable for any loss or damage whatsoever which is suffered (including but not limited to indirect or consequential loss) or for any personal injury suffered or sustained in connection with the prize or the Competition, except for any liability which cannot be excluded by law.
Melton ‘Spend and Save’ Promotion – Terms and Conditions
By accepting Funding and/or Vouchers in respect of the Spend and Save (Promotion), you are a participating trader (Participating Trader) and you consent to the following Terms and Conditions:
- The purpose of the Promotion is to support traders who rely on foot traffic and/or discretionary spending and that may be affected by major works on the Melton Level Crossing Removal (Project).
- The Promotion is run by VIDA Rail (formerly the Level Crossing Removal Project), a division of the Victorian Infrastructure Delivery Authority, an administrative office in relation to the Department of Transport and Planning, ABN 69 981 208 782 of Level 9, 121 Exhibition Street, Melbourne, Victoria 3004, www.levelcrossings.vic.gov.au, 1800 105 105 (VIDA Rail).
- The Promotion will run from 12:00 AM 12 August to 11:59 PM 31 October 2026.
- VIDA Rail will provide each Participating Trader with funding (Funding) to cover the equivalent combined value of vouchers for each Participating Trader. The number and value of the Funding (Vouchers) is at VIDA Rail’s discretion.
- Vouchers will be distributed via the following methods:
- Vouchers will be provided to Participating Traders to distribute to their customers. The Participating Trader must distribute the Vouchers to its customers.
- Vouchers will be distributed by the Project to members of the local community.
- A Participating Trader may only accept Vouchers which identify the Participating Trader as the relevant vendor.
- Subject to these Terms and Conditions (and other conditions that may be printed by VIDA Rail on a Voucher), a Participating Trader may determine additional conditions that are to apply to the redemption of the Vouchers at the relevant Participating Trader’s retail premises.
- A Voucher must be used before the expiry date printed on it in order for it to be validly redeemed.
- When a customer provides an unexpired Voucher to a Participating Trader to pay for a purchase from that Participating Trader:
- The Participating Trader must retain the Voucher.
- If the total value of the purchase is less than the value of the Voucher, the Participating Trader must honour the Voucher to the extent of the value of the purchase, but is not required to honour the difference between the value of the purchase and the value of the Voucher.
- If the total value of the purchase is greater than or equal to the value of the Voucher, the Participating Trader must honour the full value of the Voucher.
- VIDA Rail may invite traders to participate in the Promotion at its absolute discretion. For the avoidance of doubt, the following categories of businesses are not eligible to be a Participating Trader:
- Businesses owned by employees, contractors and suppliers of VIDA Rail.
- Healthcare providers and repair and maintenance services.
- Businesses whose primary offering is alcohol, tobacco/vape products, or sexual services.
- VIDA Rail reserves the right to cancel all or any part of the Promotion at its sole discretion.
- VIDA Rail is not liable for any Voucher being lost, damaged, uncollected or undelivered. Vouchers must be redeemed in accordance with the validity period specified by the Participating Trader.
- Personal information is collected to enable the administration and promotion of the Promotion, including the monitoring of compliance with these Terms and Conditions. Personal information collected, used and disclosed in connection with this Promotion is subject to the VIDA Rail Privacy Policy.
- VIDA Rail is not liable for any loss or damage whatsoever (including but not limited to indirect or consequential loss and third-party claims) which is suffered or sustained arising out of or in connection with the use of the Vouchers or the Promotion (or participation in the Promotion), except for any liability which cannot be excluded by law.
- A Participating Trader who, in VIDA Rail’s reasonable opinion, has breached these Terms and Conditions may be excluded from future Promotions as part of the Project.
West Tarneit SMS sign-up campaign
By submitting an entry into the West Tarneit SMS sign-up campaign (Promotion), you are consenting to the following terms and conditions:
- The Promotion is conducted by VIDA Rail (formerly the Level Crossing Removal Project), a division of the Victorian Infrastructure Delivery Authority, an administrative office in relation to the Department of Transport and Planning, ABN 69 981 208 782 of Level 9, 121 Exhibition Street, Melbourne, Victoria 3004, www.levelcrossings.vic.gov.au, 1800 105 105 (VIDA Rail).
- There is no entry fee for the Promotion.
- The Promotion is open to current residents of Victoria only.
- To validly enter the Promotion, a person must be 18 years of age or over on the date of their entry into the Promotion.
- The Promotion will run from 12:00AM AEST 1 June to 11:59PM AEST 31 August 2026.
- Entries are limited to one entry per person.
- Employees, contractors and suppliers of VIDA Rail are not eligible to enter the Promotion.
- To validly enter the Promotion, a person must sign up to the West Tarneit SMS notification alert by texting ‘WEST TARNEIT’ to 0427 840 967.
- By entering the Promotion, you will be added to the West Tarneit SMS subscriber list for community updates. You can opt out of the West Tarneit SMS subscriber list at any time by texting ‘UNSUBSCRIBE’ to 0427 840 967.
- The validity of entries and selection of entries are at the sole discretion of LXRP.
- VIDA Rail reserves the right to modify, suspend or cancel all or any part of the Promotion at its sole discretion.
- VIDA Rail will draw one winner at random from the previous month’s new subscribers to the West Tarneit SMS subscriber list on the first business day of every month from 1 July to 1 September 2026.
- The winner will receive a VISA gift card valued at $100 to be spent at the winner's discretion (Prize). The Prize must be redeemed in accordance with any validity period or conditions specified by the gift card issuer.
- VIDA Rail will call the winner via their SMS sign-up number to arrange a suitable time and date to deliver the gift card. If the winner is unable to be contacted after reasonable attempts are made, a replacement winner will be drawn at random. VIDA Rail will arrange a suitable time and date with the winner to deliver the gift card to them.
- The Prize is not transferable. Neither the Prize, nor any unused part of the Prize, can be sold, scalped, auctioned, raffled, pledged, or promoted as an incentive or reward. VIDA Rail is not liable for the Prize being lost, damaged, unavailable, uncollected or undelivered. To the extent permitted by law, VIDA Rail makes no representations or warranties as to the quality, suitability, redeemability or merchantability of the Prize.
- Personal information is collected to enable the administration and promotion of the Promotion, including the announcement of the winners’ names on social media or other promotional materials. Personal information collected, used and disclosed in connection with this Promotion is subject to the VIDA Rail Privacy Policy.
- VIDA Rail shall not be liable for any loss or damage whatsoever which is suffered (including but not limited to indirect or consequential loss) or for any personal injury suffered or sustained in connection with the prize or the Promotion, except for any liability which cannot be excluded by law.
Mordialloc Spend and Win competition
By submitting an entry into the Mordialloc Spend and Win competition (Competition), you are consenting to the following Terms and Conditions:
- The Competition is conducted by VIDA Rail (formerly known as the Level Crossing Removal Project), a division of the Victorian Infrastructure Delivery Authority, an administrative office in relation to the Department of Transport and Planning (ABN 69 981 208 782) of Level 9, 121 Exhibition Street, Melbourne, Victoria 3000 (VIDA Rail).
- There is no entry fee for the Competition.
- The Competition is open to current residents of Victoria only.
- Employees, contractors and suppliers of VIDA Rail are not eligible to enter the Competition.
- The Competition will run from 12:00AM AEST 27 April 2026 to 11:59PM AEST 24 May 2026 (Term).
- There will be four (4) rounds during the Term, with each round running for seven consecutive days starting at 12:01AM and closing at 11:59PM, respectively, on the dates below:
- Monday 27 April to Sunday 3 May
- Monday 4 May to Sunday 10 May
- Monday 11 May to Sunday 17 May
- Monday 18 May to Sunday 24 May
- To validly enter the Competition, a person (Entrant) must:
- spend a minimum amount of AUD$10.00 in a single transaction (Minimum Transaction Amount) during the Term at a store displaying advertising material for the Competition in Mordialloc (Participating Trader). The Minimum Transaction Amount is the final and total purchase amount that the customer has paid to the Participating Trader, inclusive of GST and any other fees incurred;
- complete a hard copy entry form; and
- submit the completed entry form at a Participating Trader by the closing date of each round outlined in paragraph 6.
- For transactions to be eligible, the entry must include proof of payment by showing one of the following:
- a clear, legible copy of a valid Australian tax receipt showing the transaction details, including the date of purchase, amount paid and business name; or
- a screenshot or PDF of the online payment confirmation showing the transaction ID date of purchase and amount paid; or
- any other official document or payment verification provided by the Participating Trader.
- Entries are valid for whichever of the four rounds outlined in paragraph 6 during which the entry is received.
- Entries are unlimited as long as the Minimum Transaction Amount is met. Only one entry form can be submitted per transaction.
- The validity of entries and selection of entries is at the sole discretion of VIDA Rail.
- VIDA Rail reserves the right to modify, suspend or cancel all or any part of the Competition at its sole discretion.
- Two (2) winners will be drawn at random following the end of each round.
- Each winner will receive a $200 Mordialloc Traders Association Mordy Gift Card (Mordy Gift Card).
- The Mordy Gift Cards must be redeemed in accordance with any validity period or conditions specified by the Mordy Gift Card terms and conditions. The Mordy Gift Card terms and conditions are available at the Mordialloc website.
- Mordy Gift Cards are not transferable. Mordy Gift Cards cannot be sold, scalped, auctioned, raffled, pledged, or promoted as an incentive or reward. VIDA Rail is not liable for any Mordy Gift Card being lost, damaged, unavailable, uncollected or undelivered. VIDA Rail makes no representations or warranties as to the quality, suitability, redeemability or merchantability of the Mordy Gift Cards.
- Each winner will be notified via the contact details included on the entry form. If a winner is unable to be contacted after reasonable attempts are made, a replacement winner will be drawn at random.
- Personal information is collected to enable the administration and promotion of the Competition, including the announcement of the winners’ names on social media or other promotional materials. Personal information collected, used and disclosed in connection with this Competition is subject to the VIDA Privacy Policy.
- VIDA Rail shall not be liable for any loss or damage whatsoever which is suffered (including but not limited to indirect or consequential loss) or for any personal injury suffered or sustained in connection with the prize or the Competition, except for any liability which cannot be excluded by law.
Hopkins Road SMS sign-up promotion
By submitting an entry into the Hopkins Road SMS sign-up promotion (Promotion), you are consenting to the following terms and conditions:
- The Promotion is conducted by VIDA Rail (formerly the Level Crossing Removal Project) a division of the Victorian Infrastructure Delivery Authority, an administrative office in relation to the Department of Transport and Planning, ABN 69 981 208 782 of Level 9, 121 Exhibition Street, Melbourne, Victoria 3000 (VIDA Rail).
- There is no entry fee for the Promotion.
- The Promotion is open to current residents of Victoria only.
- The Promotion will run from 12:00AM AEST 24 March 2026 to 11:59PM AEST 18 May 2026 (Promotion Period).
- To validly enter the Promotion, a person must:
- be 18 years of age or over on the date of their entry into the Promotion; and
- sign up to the Hopkins Road SMS notification by texting ‘HOPKINS’ to 0438702491(Entrant).
- An individual is allowed no more than one entry into the Promotion during the Promotion Period.
- Employees, contractors and suppliers of VIDA Rail are not eligible to enter the Promotion.
- By entering the Promotion, you will be added to the Hopkins SMS subscriber list for community updates. You can opt out of the Hopkins SMS subscriber list at any time by texting ‘UNSUBSCRIBE’ to 0438702491.
- The validity of entries and selection of entries are at the sole discretion of VIDA Rail.
- VIDA Rail reserves the right to modify, suspend or cancel all or any part of the Promotion at its sole discretion.
- The total prize pool for the Promotion will be $1000, consisting of ten myki cards valued at $100 each which can be used in accordance with the Victorian Fares and Ticketing Manual (Prize Pool).
- On Wednesday 29 April 2026, after the expiry of the Promotion Period, VIDA Rail will draw 10 winners at random from valid entries in the Promotion.
- Each winner will receive one myki card valued at $100 from the Prize Pool (Prize).
- VIDA Rail will contact the 10 winning Entrants via the phone number used to subscribe to the Hopkins SMS subscriber list to arrange a time and date to deliver the Prize. If VIDA Rail is unable to contact the winner(s) after reasonable attempts are made, VIDA Rail reserves the right to draw a replacement winner(s) at random.
- The Prize must be used in accordance with any validity period or conditions specified by the Victorian Fares and Ticketing Conditions 2026.
- The Prize is not transferable. Neither the Prize, nor any unused part of the Prize, can be sold, scalped, auctioned, raffled, pledged, or promoted as an incentive or reward. VIDA Rail is not liable for the Prize being lost, damaged, unavailable, uncollected or undelivered. To the extent permitted by law, VIDA Rail makes no representations or warranties as to the quality, suitability, redeemability or merchantability of the Prize.
- Personal information is collected to enable the administration and promotion of the Promotion, including the announcement of the winners’ names on social media or other promotional materials. Personal information collected, used and disclosed in connection with this Promotion is subject to the VIDA Rail Privacy Policy.
- VIDA Rail shall not be liable for any loss or damage whatsoever which is suffered (including but not limited to indirect or consequential loss) or for any personal injury suffered or sustained in connection with the prize or the Promotion, except for any liability which cannot be excluded by law.
Newport SMS sign-up campaign
By submitting an entry into the Newport SMS sign-up campaign (Promotion), you are consenting to the following terms and conditions:
- The Promotion is conducted by VIDA Rail (formerly the Level Crossing Removal Project), a division of the Victorian Infrastructure Delivery Authority, an administrative office in relation to the Department of Transport and Planning, ABN 69 981 208 782 of Level 9, 121 Exhibition Street, Melbourne, Victoria 3004, www.levelcrossings.vic.gov.au, 1800 105 105 (LXRP).
- There is no entry fee for the Promotion.
- The Promotion is open to current residents of Victoria only.
- To validly enter the Promotion, a person must be 18 years of age or over on the date of their entry into the Promotion.
- The Promotion will run from 12:00AM AEST 5 March to 11:59PM AEST 31 August 2026.
- Entries are limited to one entry per person.
- Employees, contractors and suppliers of LXRP are not eligible to enter the Promotion.
- To validly enter the Promotion, a person must sign up to the Newport SMS notification alert by texting ‘NEWPORT’ to 0429 839 892.
- By entering the Promotion, you will be added to the Newport SMS subscriber list for community updates. You can opt out of the Newport SMS subscriber list at any time by texting ‘UNSUBSCRIBE’ to 0429 839 892.
- The validity of entries and selection of entries are at the sole discretion of LXRP.
- LXRP reserves the right to modify, suspend or cancel all or any part of the Promotion at its sole discretion.
- LXRP will draw three winners at random from the Newport SMS subscriber list on the first day of every month from 1 April to 1 September 2026.
- The winner will receive a gift card valued at $100 to be spent at a local trader (Prize). The Prize must be redeemed in accordance with any validity period or conditions specified by the trader issuing the gift card.
- LXRP will call the winner via their SMS sign-up number to arrange a suitable time and date to deliver the gift card. If the winner is unable to be contacted after reasonable attempts are made, a replacement winner will be drawn at random. LXRP will arrange a suitable time and date with the winner to deliver the gift card to them.
- The Prize is not transferable. Neither the Prize, nor any unused part of the Prize, can be sold, scalped, auctioned, raffled, pledged, or promoted as an incentive or reward. LXRP is not liable for the Prize being lost, damaged, unavailable, uncollected or undelivered. To the extent permitted by law, LXRP makes no representations or warranties as to the quality, suitability, redeemability or merchantability of the Prize.
- Personal information is collected to enable the administration and promotion of the Promotion, including the announcement of the winners’ names on social media or other promotional materials. Personal information collected, used and disclosed in connection with this Promotion is subject to the VIDA Rail Privacy Policy.
- LXRP shall not be liable for any loss or damage whatsoever which is suffered (including but not limited to indirect or consequential loss) or for any personal injury suffered or sustained in connection with the prize or the Promotion, except for any liability which cannot be excluded by law.
Mordialloc Spin the Wheel competition
By participating in the Mordialloc Spin the Wheel (Competition), you are consenting to the following Terms and Conditions:
- The Competition is conducted by VIDA Rail (formerly known as the Level Crossing Removal Project), a division of the Victorian Infrastructure Delivery Authority, an administrative office in relation to the Department of Transport and Planning (ABN 69 981 208 782) of Level 9, 121 Exhibition Street, Melbourne, Victoria 3000 (VIDA Rail).
- There is no entry fee for the Competition.
- The Competition is open to current residents of Victoria only.
- The Competition will run from Wednesday, 29 October 2025 to Thursday, 31 December 2026. (Competition Period).
- To validly enter the Competition, a person (Entrant) must:
- attend a Mordialloc Level Crossing Removal Project pop-up in the Mordialloc or Aspendale area (Project Pop-Up) during the Competition Period; and
- speak with a project representative in branded VIDA Rail attire, who will administer permission to spin the wheel.
- Entrants who spin the wheel and land on the ‘Prize Draw’ wedge will enter a draw to win a $100 voucher to be redeemed at local traders participating in the Competition (Participating Local Traders) (Prize Draw).
- Entrants who spin the wheel and land on a wedge other than the ‘Prize Draw’ will win a prize determined by where the clicker on the wheel lands. Prizes outside of the Prize Draw include:
- snacks;
- coffee vouchers for Participating Local Traders; and
- Mordy Gift Cards valued at $10.
The prize (other than prizes related to the Prize Draw) can be collected at the Project Pop-Up.
- The total prize pool for the Prize Draw will be $600, consisting of six $100 vouchers redeemable at Participating Local Traders.
- VIDA Rail will randomly select from Entrants eligible for the Prize Draw and contact those drawn as a winner via their nominated notification method.
- There will be six winners of the Prize Draw, each receiving one of the available $100 vouchers.
- VIDA Rail is not liable for any voucher being lost, damaged, uncollected, or undelivered. Vouchers must be redeemed in accordance with the validity period and conditions specified by the relevant voucher.
- An individual is allowed no more than one entry into the Competition during the Competition Period. A parent or guardian who has entered the Competition may nevertheless assist their dependent(s) to participate in the Competition.
- An entrant cannot spin the wheel more than once.
- Employees, contractors, and suppliers of VIDA Rail are not eligible to enter the Competition.
- Validity and selection of entries is at VIDA Rail’s sole discretion.
- The Project Pop-Up dates and times will be selected and run at VIDA Rail’s discretion.
- VIDA Rail reserves the right to cancel all or part of the Competition at its sole discretion.
- Personal information is collected to enable the administration and promotion of the Competition, including the announcement of the winners’ names on social media or other promotional materials. Personal information collected, used and disclosed in connection with this Competition is subject to the VIDA Rail’s Privacy Policy.
VIDA Rail shall not be liable for any loss or damage whatsoever which is suffered (including but not limited to indirect or consequential loss) or for any personal injury suffered or sustained in connection with the prize or the Competition, except for any liability which cannot be excluded by law.
Mordialloc SMS sign-up campaign
By submitting an entry into the Mordialloc SMS sign-up campaign (Promotion), you are consenting to the following terms and conditions:
- The Promotion is conducted by the Level Crossing Removal Project, a division of the Victorian Infrastructure Delivery Authority, an administrative office in relation to the Department of Transport and Planning, ABN 69 981 208 782 of Level 9, 121 Exhibition Street, Melbourne, Victoria 3004, www.levelcrossings.vic.gov.au, 1800 105 105 (LXRP).
- There is no entry fee for the Promotion.
- The Promotion is open to current residents of Victoria only.
- To validly enter the Promotion, a person must be 18 years of age or over on the date of their entry into the Promotion.
- The Promotion will run from 12:00AM AEST 16 August 2025 to 11:59PM AEST 31 August 2025.
- Entries are limited to one entry per person.
- Employees, contractors and suppliers of LXRP are not eligible to enter the Promotion.
- To validly enter the Promotion, a person must subscribe to the Mordialloc SMS subscriber list by texting ‘MORDIALLOC’ to 0429 839 892.
- By entering the Promotion, you will be added to the Mordialloc SMS subscriber list to receive SMS notification alerts for community updates relating to the Project. You can opt out of the Mordialloc SMS subscriber list at any time by texting ‘UNSUBSCRIBE’ to 0429 839 892.
- The validity of entries is at the sole discretion of LXRP.
- LXRP reserves the right to modify, suspend or cancel all or any part of the Promotion at its sole discretion at any time without notice.
- LXRP will draw 20 winners at random from the Mordialloc SMS subscriber list on 1 September 2025.
- There will be a total of 20 prizes valued at $200 each and each winner will receive one prize. Prizes are Mordy Gift cards (see Mordy Gift Card - Mordialloc). Prizes may be subject to their own terms and conditions.
- LXRP will contact winners via their SMS sign-up number to arrange a suitable time and date to deliver the prize. If a winner is unable to be contacted after reasonable attempts are made, a replacement winner will be drawn at random.
- Prizes are not transferable. Prizes and any unused part of the prizes cannot be sold, scalped, auctioned, raffled, pledged or promoted as an incentive or reward. LXRP is not liable for prizes being lost, damaged, unavailable, uncollected or undelivered. To the extent permitted by law, LXRP makes no representations or warranties as to the quality, suitability, redeemability or merchantability of the prizes.
- Personal information is collected including for the purpose of communicating community updates and to enable the administration and promotion of the Promotion, including the announcement of the winners’ names on social media or other promotional materials. Personal information collected, used and disclosed in connection with this Promotion is subject to the Level Crossing Removal Project’s Privacy Policy.
- LXRP shall not be liable for any loss or damage whatsoever which is suffered (including but not limited to indirect or consequential loss) or for any personal injury suffered or sustained in connection with the prize or the Promotion, except for any liability which cannot be excluded by law.
Mordialloc Say The Word Promotion
By submitting an entry into the Mordialloc Say the Word Promotion (Promotion), you are consenting to the following Terms and Conditions.
- The Promotion is conducted by the Level Crossing Removal Project, a division of the Victorian Infrastructure Delivery Authority, an administrative office in relation to the Department of Transport and Planning (ABN 69 981 208 782) of Level 9, 121 Exhibition Street, Melbourne, Victoria 3000, www.levelcrossings.vic.gov.au, 1800 105 105 (LXRP).
- There is no entry fee for the Promotion.
- The Promotion is open to current residents of Victoria only.
- To validly enter the Promotion, a person must be aged at least 18 years old on the first day of the Promotion.
- Employees, contractors and suppliers of LXRP are not eligible to enter the Promotion.
- The Promotion will run from 12:00AM AEST 12 August to 11:59PM AEST 17 August 2025 (Promotion Period).
- There will be 5 rounds during the Promotion Period. Each round will run for one day during the relevant participating trader (Mordialloc Participating Trader)’s business hours on each of the following dates:
- Wednesday, 13 August 2025
- Thursday, 14 August 2025
- Friday, 15 August 2025
- Saturday, 16 August 2025
- Sunday, 17 August 2025
- On the day prior to each round, the Mordialloc Traders Association will announce on the Main Street Mordialloc’s accounts on Facebook and/or on Instagram (at the handle @mainstreetmordialloc):
- the name of the Mordialloc Participating Trader for that round;
- the relevant codeword of the day for that round; and
- the Mordialloc Participating Trader’s business trading hours for that round, for the following day.
- To validly enter the Promotion, on the day of a round, a person must:
- attend the address of the relevant Mordialloc Participating Trader during its business hours;
- state the relevant codeword to the shop attendant.
The first three individuals to state the correct codeword will be eligible for a prize (Prize).
- Each winner will be identified by the shop attendant at the relevant Participating Mordialloc Trader at their discretion.
- There will be 15 Prizes with a total prize pool of $1,750
- Five $200 Mordy Gift Cards;
- Five $100 Mordy Gift Cards;
- Five $50 Mordy Gift Cards.
- Each winner will receive a Mordy Gift Card, which can then be redeemed in accordance with any terms and conditions stated on the relevant voucher. The voucher must be redeemed within the validity period and subject to any conditions specified on the relevant voucher.
- The Prize is non-transferable. Neither the Prize, nor any unused part of the Prize, can be sold, scalped, auctioned, raffled, pledged or promoted as an incentive or reward.
- LXRP reserves the right to modify, suspend or cancel all or any part of the Promotion at its sole discretion.
- To the extent permitted by law, LXRP makes no representations or warranties as to the quality, suitability, or merchantability of the Prize. LXRP makes no representations and gives no warranties that all Prizes will be distributed or claimed.
- LXRP is not liable for any Prize being lost, damaged, unavailable, uncollected, undelivered or unable to be redeemed for whatever reason.
- Personal information is collected to enable the administration and promotion of the Promotion, including the announcement of the winners’ names on social media or other promotional materials. Personal information collected, used and disclosed in connection with this Promotion is subject to the Level Crossing Removal Project’s Privacy Policy.
- LXRP shall not be liable for any loss or damage whatsoever which is suffered (including but not limited to indirect or consequential loss) or for any personal injury suffered or sustained in connection with the Prize or the Promotion, except for any liability which cannot be excluded by law.