On this page
Explore the station
Transport connections
The station is open from 7am and 7pm each day until the Big Switch on 1 February 2026, however trains do not run at all times. Check the Transport Victoria Journey Planner for train timetables.
Accessing the platforms
Preview the journey from our entry points to the train platforms.
Grattan Street East
Royal Parade East (via lift)
Royal Parade West
Royal Parade West (via lift)
Grattan Street West (via escalator)
Grattan Street West (via lift)
Photo gallery
Design
At the Grattan Street entrance the 54m-long glass and steel canopy and skylights draw natural light into the station.
The artwork Vernal Glade in the station concourse is by renowned Australian artist Patricia Piccinini.
Use your mouse to move the viewpoint around. Note: elements of the completed station may differ from this animation.
Best viewed on YouTube or a desktop computer.