We’ve widened this key arterial route from two to four lanes, making the 35km journey quicker and safer for up to 13,000 drivers every day.
The new highway has:
In 2015, we started adding extra lanes on the Princes Highway between Winchelsea and Colac. Sections were opened as they were completed.
We separated the upgrade into four stages:
View a larger version of the map (PDF, 171.5 KB)
See an overview of the Prince Highway West project.
As part of the Princes Highway Upgrade in Colac and Colac East, we have:
Watch how we constructed the the bridge over Barongarook Creek as part of the the Princes Highway West Upgrade.
Between Warncoort and Colac East, we:
We opened this section to traffic in 2019.
As part of the upgrade between Armytage Road and Warncoort we:
We completed this section in April 2019.
Level crossing removed
In 2019, we opened two new bridges over the Geelong-Warrnambool Railway Line at Warncoort. We removed a dangerous level crossing and have provided a safer trip for the 8000 drivers who travel between Winchelsea and Colac each day.
Between Deans Marsh Road, Winchelsea and Armytage Road we:
We completed this section in May 2018.