Skip to main content
Skip to navigation
Victoria’s Big Build
Projects
Disruptions
News
Search
Home
Projects
Big Build Roads
Echuca-Moama Bridge Project
Image gallery
November 2020
Big Build Roads
Project menu
Toggle Navigation
Project home
Stages
Toggle navigation items
Stage 1
Stage 2
Stage 3
Stage 4
Environment
Toggle navigation items
EES
Design
Image gallery
Completed in 2022
November 2020
Echuca Moama Bridge Project
Project home
Stages
Toggle navigation
Stage 1
Stage 2
Stage 3
Stage 4
Environment
Toggle navigation
EES
Design
Image gallery
Murray River bridge piers being built.
An artists impression of the Campaspe river's new bridge with the river flowing below it. There are two bridges; the one above is for vehicles and the bridge below is for pedestrians and bicycles
Campaspe River bridge beam installation.
Future road looking north near sporting precinct.
Steel beam lifted into place for Campaspe River bridge.
Steel beam lifted into place for Campaspe River bridge.
Steel beam lifted into place for Campaspe River bridge.
Steel beams in place for Campaspe River bridge and the new shared walking and cycling bridge installed.
Murray River bridge pier construction
Murray River bridge pier construction
Yes
No
It was easy to understand
It answered my question
I couldn’t find what I needed
Page took too long to load
Something went wrong
It was hard to understand
Tell us how to make this page better
Submit