COMPLETE

Design

South Road Upgrade

Project designs

With input from the community (PDF, 4.9 MB) and stakeholders including councils and the Department of Transport and Planning (DTP), we made 2 key changes to our final designs after sharing the draft designs in March 2021.

  • We didn't remove the 2 left slip lanes from the Nepean Highway to South Road westbound as originally planned. This helped to maintain traffic flow on South Road.
  • We made a small change to the location of the pedestrian crossing across South Road at Taylor Street, moving the whole crossing further east. This provided more space for vehicles to queue on the eastbound lanes before the Jasper Road intersection. It also allowed drivers turning right from Jasper Road onto South Road to see pedestrians using the crossing sooner.

Signalling art on South Road

When heading down South Road, walkers, cyclists and motorists can view some magnificent First Nation’s artwork dotting the intersections. Inspired by the wildlife and landscape of the Bunurong people’s traditional lands around Port Phillip Bay, we proudly partnered with First Nation's art consultancy Kaptify to create signal box art for the South Road Upgrade.

As part of the artwork installation there are 5 pieces you can see on South Road, celebrating the landmarks, traditions, animals and plant life that make up the local Bunurong area.

  • Supertubes – coastal theme, a wave break at Rye as well as elements of the Bayside area with the artwork representing the fire-stick farming and how the Bunurong people managed the country. This artwork is over 20 years old, which Adam continues adding to with over 100 layers of colours now part of the ever-evolving piece.
  • Bunurong Feathers – Highlighting the majestic birds of the region, Bunurong Feathers aptly celebrates the feathers from country and the birds that call the Sandbelt Heath their home.
  • Scorpius, Waerrener and the Moonah – Named for 3 important elements for local communities, Scorpius, Waerrener and the Moonah celebrates the rich history of the Bunurong sea country. The Moonah tree is an important and symbolic tree for Bunurong women, Scorpius is the winter constellation that maps out Naarm, while the Waerrener shell is synonymous around the Bayside area and was a popular shellfish eaten by the Bunurong people.
  • Scorpius – a true reflection of Scorpius the constellation and mapping the area of the country through the Moorabbin area, through from St Kilda all the way to Point Nepean on the eastern side of the bay.
  • Yeah Nah – Installed on top of each of the other 4 South Road artwork signal boxes, this piece is inspired by the butterflies which emerge during Bareep (or Spring) in Boonwurrung language.