The intervention and ventilation facility and backup control centre are co-located to efficiently and effectively manage any incidents that may occur.
The emergency support facility needs to be located at this point due to the length of the twin tunnels in this section.
The site was considered against a range of criteria including engineering design, tunnel operation requirements, the environment, availability of suitable land, and minimising property acquisition and impacts on local jobs, the environment and the local surrounding community.