During normal rail operations, the buildings will not produce significant noise or other emissions. Noise mitigation will be based on requirements as outlined by EPA Victoria (Publication 1826).

This includes assessment of noise levels as well as setting allowable noise limits. Access to the site will generally be during normal working hours, however access may be required outside of normal working hours in an emergency or for maintenance works.