Explore the station

Transport connections

The station is open from 7am and 7pm each day until the Big Switch on 1 February 2026, however trains do not run at all times. Check the Transport Victoria Journey Planner for train timetables.

Design

The grand main entrance features 12m-high columns topped with massive beams, reflecting the classical architecture of the nearby State Library Victoria.

The artwork Forever at the station entrance is by Australian artist Danie Mellor.

3D virtual tour

Use your mouse to move the viewpoint around. Note: elements of the completed station may differ from this animation.

Best viewed on YouTube or a desktop computer.

Download