The veloway is designed to provide an express route for cyclists and will be restricted to cyclist use only.
There will be signs at either end of the veloway advising pedestrians not to enter.
Pedestrians should continue to use the existing walking and cycling path at ground level on Footscray Road, which remains open and was upgraded with our works.