Travelling towards the city

Step 1: Choose your lane early

Choose between the West Gate Tunnel or West Gate Bridge.

Step 2: Enter the West Gate Tunnel

Follow the signs to enter the West Gate Tunnel. The tunnel entrance is off the West Gate Freeway near Williamstown Road.

Step 3: Choose your final destination

Once you exit the tunnel, follow the signs for your destination.


Travelling away from the city

Use the West Gate Tunnel or the West Gate Bridge – the choice is yours.

Step 1: Choose your starting point

Step 2: Once on the West Gate Freeway, choose your lane early for Geelong or Ballarat

New no-truck zones

When the West Gate Tunnel opens, six inner west roads will have 24-hour no-truck zones.

This will cover Francis Street and Somerville Road in Yarraville, Buckley Street and Moore Street in Footscray, Blackshaws Road in Altona North, and Hudsons Road in Spotswood. A night-time and weekend no-truck zone will also be in place on Williamstown Road (8pm – 6am weekdays and at all times on weekends).

Roadside cameras will help monitor and enforce the no-truck zones.  Exceptions will apply for trucks with local origins and destinations within  the zones for local deliveries, construction or maintenance works, and  other situations as prescribed in the No-Truck Zone regulations.  Visit transport.vic.gov.au/no-truck-zones for more information.

Plan your trips in advance

Paying for trips on the West Gate Tunnel

All heavy vehicles will pay a single toll on the West Gate Freeway located between Williamstown Road and Millers Road, no matter if you use the tunnel, the West Gate Bridge or the Hyde Street ramps. Learn more on our Tolls and your trip webpage.

Download a printable version

Learn about the West Gate Tunnel and your travel options. If you need help with accessing this PDF, contact us at 1800 105 105. For translation assistance please ring 9209 0147.

Download now