Eateries, car and dog wash and BP at 210 Ballan Road
McGrath Road north is now open at Ballan Road. Visit the eateries, car and dog wash and BP with left in/left out from either the McGrath Road north or Ballan Road shop driveways.
Wyndham Vale Healthcare, pharmacy, 7-Eleven and Ultra Tune
Access to local shops will be maintained during major works on the southern side of Ballan Road.
Please continue to make your appointments with Wyndham Vale Healthcare, visit the pharmacy, fill up at 7-Eleven and service your car at Ultra Tune as works progress.
McGrath Road south will be closed at Ballan Road until 8pm, Friday 6 November. You’ll be able to access Wyndham Vale Healthcare, pharmacy, 7-Eleven and Ultra Tune:
By car
- Ballan Road driveway (left in for Manor Lakes bound traffic), or
- McGrath Road south driveway
- Werribee bound traffic can access McGrath Road south via Cambridge Crescent.
On foot
- walk the footpath and pedestrian detours around the works area to shops
- use the temporary push-button pedestrian crossing on Ballan Road.
Shop access map

To prepare for the intersection opening and traffic light turn on, we’ll close the intersection overnight from 8pm to 5am, Thursday 5 November and over the weekend from 8pm, Friday 6 November to 5am, Monday 9 November.
Please continue to visit your favourite local shops over the weekend disruption.
On foot
- Use the Werribee Flood Way footpath under the bridge and footpaths to shops.
By car
Access to BP, eateries and Car & Dog Wash remains open via:
- McGrath Road north driveway via Bolton Road (left in/right out guided by traffic controllers).
Access to 7‑Eleven, the medical clinic & pharmacy and Ultra Tune remains open via:
- McGrath Road south driveway via Cambridge Crescent or Honour Avenue (right in/left out)
Your support matters. Thank you for continuing to shop local during the Ballan Road Intersection Upgrade.
Shop access map
Applicable at night from 8pm to 5am, Thursday 5 November, and over the weekend from 8pm, Friday 6 November to 5am, Monday 9 November.
