We’ll run a free community shuttle bus to help you move safely between Wallan train station, Wallara Waters and Wallan town centre.
The service will run 16 hours a day, 7 days a week, in a continuous loop between Wallan train station, the entrance to Wallara Waters and Wallan town centre.
The community shuttle bus will run from 6am to 10pm each day to help pedestrians and cyclists safely cross the bridge.
Pedestrians and cyclists needing to cross the Watson Street bridge outside of the shuttle bus hours or who may have special travel needs or require assistance should call us on 1800 105 105 at anytime or email contact@bigbuild.vic.gov.au
Key features of this shuttle bus:
- 47-seat low-floor bus
- wheelchair accessible
- bicycle and scooter storage
- operated by Seymour Coaches, an experienced local provider that runs PTV services.
Local bus services will operate as normal, with no changes to existing routes or timetables.

Buses will run every 20 mins* from the following stops:
| First bus time | Last bus time | Stop |
|---|---|---|
| 6.00 am | 9.40 pm | Public Hall/Northern Hwy |
| 6.01 am | 9.41 pm | Wallan Community Centre |
| 6.03 am | 9.43 pm | McCarthy Ct/Watson St |
| 6.07 am | 9.47 pm | Wallan Station |
| 6.08 am | 9.48 pm | Wallan-Whittlesea Rd/Wallara Waters Rd |
| 6.10 am | 9.50 pm | McCarthy Ct/Watson St |
| 6.14 am | 9.54 pm | Public Hall/Northern Hwy |
*Please note: the 9:00am, 9:20am, 4:20pm and 4:40pm shuttle services do not run on weekends.