Victorian Tunnelling Centre

Located at Holmesglen Institute’s Chadstone campus, the Victorian Tunnelling Centre works closely with Victorian projects including:

Training and courses

The VTC offers both certificate and diploma qualifications, as well as safety-based training for working underground.

Training is aimed at all levels, from new entrants through to existing workforce, engineers and managers.

Apprentices, trainees and cadets attending the VTC are a critical part of Victoria’s future workforce for the pipeline of infrastructure projects.

Purpose-built facilities

The VTC training facilities have been purpose-built and include:

  • a replica mined road tunnel (3 lanes wide)
  • a replica tunnel boring machine tunnel
  • a 7.2m-tall tunnel boring machine cutterhead
  • 2 multipurpose engineering workrooms
  • virtual reality training programs
  • tunnel shaft and concrete lining spray simulators
  • working refuge chamber.

The centre was co-funded by North East Link, Metro Tunnel Project and West Gate Tunnel Project. It was modelled on the successful Tunnelling and Underground Construction Academy established as part of London’s Crossrail and the Tunnel Training Academy in Kuala Lumpur.

For more information on the VTC please call 1300 639 111 or visit the Holmesglen Victorian Tunnelling Centre webpage.