COMPLETED

Camp Road, Campbellfield

The level crossing at Camp Road, Campbellfield was removed by lowering the rail line into a 870m long trench under the road.

Prior to its removal, the boom gates were down for about 10 minutes during the morning peak causing delays and congestion for the 30,000 road users each day.

Timeline

The Camp Road level crossing was removed in late 2017.

Project video