Hello new Thompsons Road bridge, goodbye level crossing
Read more
The level crossing at Thompsons Road, Lyndhurst was removed by VicRoads on behalf of the Level Crossing Removal Project as part of a wider upgrade of Thompsons Road.
The crossing was removed by building the first of 2 road bridges over the rail line.
The Thompsons Road Upgrade includes widening Thompsons Road to 3 lanes in each direction between Marriott Boulevard and the South Gippsland Highway.
The Thompsons Road level crossing was removed in June 2018.