The new City Square above the Town Hall Station features designs which were developed in consultation with Wurundjeri Elders.
The square will have a permanent bronze smoking ceremony dish and gathering area, co-designed with Wurundjeri Woi-wurrung Elder Aunty Joy Murphy Wandin by Greenshoot Consulting.
Woi-wurrung language and designs developed by Wurundjeri artist Lewis Wandin-Bursill are etched on terraces and seating throughout the Square.
Barerarerungar by Maree Clarke is a vibrant 45 metre-long installation that will line the Federation Square entrance to Town Hall Station. Made up of 30 glass panels, the work weaves together cultural and ecological narratives of the 5 clans of the eastern Kulin Nations through photographic landscapes and features significant scar trees and intricate line drawings inspired by traditional possum skin cloak designs.
Back to Celebrating First Peoples culture homepage.
